| No. | Name |
| Preparation platform | |
| 1 | conveyor belt,67meters |
| 2 | flat pulley |
| 3 | skid type haul-off unit |
| 4 | electrical automatic control system |
| 5 | motor with belt wheel |
| 6 | gear box |
| 7 | guide wheel |
| 8 | pulleys |
| 9 | traction head,Φ19~Φ150 |
| Vulcanization platform | |
| 1 | air-actuated clamp |
| 2 | automatic telescopic device,control box |
| 3 | steam ball valve,drain valve |
| 4 | pressure gauge,accessories |
| Testing system | |
| 1 | pump head(excluding hydraulic pump) |
| 2 | track wheel |
| 3 | high pressure valve,hose,gauge(excluding booster pump) |
| Dyring system | |
| 1 | air blower |
| 2 | air passage |
| 3 | electrical cabinet |
| Winding system | |
| 1 | single winder |
| 2 | double winder |
| If use stainless steel Gas separating tank , cost increases | |
| Field service charge( welding, drilling, assembling and painting) |